MLP Railway Maintenance Ltd have had numerous major contracts all of which have been completed earlier than the specified times.

  • Alcan Smelting
    • Two 300 metre track replacements over two weekends.
  • Aberthaw Power Station
    • 1¼ mile track and formation renewal
    • Turnout replacement and installation of two Bomag crossings in under Three weeks.
  • Lafarge Mountsorrel
    • Various Turnout replacements throughout the year over weekends
    • 360 metre track and formation renewal over a weekend.
  • Minor track works have also taken place at various sites throughout the year including:
    • weed killing and devegetation
    • track maintenance
    • track inspections
  • Major works have also taken place for Railweight with installations of weighing systems throughout the UK with Didcot being the most recent.
  • Concreting works have also taken place with 30 metre slabs been layed for weighing systems and a complete yard concreted for Freightliner in Dagenham.

Work at Alberthaw Power Station

Work at Alberthaw Power Station

Work at Alberthaw Power Station